Search
Close this search box.

Solution — Project supply

Bulk mirror orders for hotels, shopping malls and office projects

Engineering contractors for hotels, shopping malls and office buildings require mirrors that meet demands for large volumes, high standards and tight coordination on site. What they are really buying is a delivery date that holds.

  • Single projects of 10,000+ units
  • 15–35 day lead time
  • 28-point QC with photo report
Round mirrors in a modern hotel lobby
Hotel lobby program — round models supplied with concealed fixing and matching frames.

Project-scale risk

What goes wrong on large orders

At project scale the failure is rarely the mirror. It is the schedule, the material and the quotation that was not itemised.

01

Peak season saturates the line

Several projects running at once can push a single project out of its slot, and the site date does not move with it.

02

Upstream material runs short

Ultra-clear glass, special coatings or drivers can go short after the order is placed, and the factory cannot absorb that delay quietly.

03

Site changes after production starts

A size adjustment or a process upgrade mid-project needs a line that can re-plan a batch, not one that restarts the whole order.

How we hold the date

Four things we control directly

Capacity, material, change handling and the quotation breakdown are all managed in-house.

Capacity

Slots reserved before peak

Annual capacity exceeds 10 million units, and single projects of 10,000+ mirrors are planned into the line before the season fills up.

Materials

Material locked with the order

Glass and coating volumes are reserved when the order is confirmed, not drawn from whatever happens to be left on the shelf.

Changes

Late changes handled by batch

Size and process changes are re-planned batch by batch, so the rest of the order keeps moving while one model is corrected.

Cost

Itemised quotation

Base production cost, special process surcharge and transport and insurance are quoted on separate lines, so an upgrade is priced on its own line rather than as a surprise.

Specification

Project parameters

Send the model list and site date; these are the parameters we plan against.

Project scaleSingle projects of 10,000+ mirrors, for example hotel guest room mirrors or fitting room mirrors for a mall.
Annual capacityMore than 10 million units across the factory.
Lead time15–35 days after confirmation, planned against your site date.
Quality control28-point in-plant inspection with a photo report before packing.
DocumentationCE, RoHS, FCC, CB and ISO 9001; UL and SAA arranged on request.
PackingCorner protection, foam and a container loading plan by model and by floor.

Process

From project brief to dispatch

Project brief

Drawings, quantities per model, site date and destination port.

Feasibility and quote

Itemised quotation with the production slot reserved.

Sample or mock-up

A representative unit approved before the batch starts.

Batch production

Staged by model, so early trades are not waiting for the last batch.

QC and dispatch

28-point inspection, photo report, booking and documents.

Capacity you can plan against

Project buyers are not buying a mirror, they are buying a date. Slots and materials are reserved before the season fills up.

10M+units per year
10,000+mirrors in one project
15–35days lead time
28inspection points
CERoHSFCCCBISO 9001UL / SAA on request

FAQ

Questions project buyers ask

How large a single project can you take?

Single projects of 10,000+ mirrors are planned routinely, for example hotel guest room mirrors or mall fitting room mirrors. Send the model list and site date and we will confirm the slot.

Can you hold a production slot for a site date?

Yes. The slot is reserved when the order is confirmed and we plan the batch sequence against your installation schedule.

What is included in the quotation?

Base production cost, special process surcharges, and transport and insurance are itemised separately, so a later upgrade is priced on its own line.

Do you provide documents for the project consultant?

CE, RoHS, FCC, CB and ISO 9001 documents are issued with the shipment; UL and SAA can be arranged on request for the destination market.

Send your specification, get a quote

Message us on WhatsApp at +86 157 3196 6651 with product type, target quantity and destination country, or email jack.niu@wosenint.com.

Email
Email:jack.niu@wosenint.com
WhatsApp
WhatsApp QR Code
(0/8)